Home / Priority claims register / PC-037

Priority claim · PC-037

Eden Engineering research note released 22 February 2026; expanded specification withdrawn 14 July 2026

First date: Timeline

This was first published by Michael Darius Eastwood on . Anchored evidence is listed below. See the machine-readable priority record at /research/priority/ and the full ledger at /priority-claims.

The claim - verbatim

Michael Darius Eastwood first entered a conceptual Eden Engineering public research note into the public record on 22 February 2026 under OSF DOI 10.17605/OSF.IO/6C5XB. The greatly expanded working specification and its rendered PDF were withdrawn on 14 July 2026 pending patent and disclosure review; the withdrawal notice is the current public record. Hardware framing is held at the site's published two-sentence ceiling: safety constraints at hardware level through cryptographic tokens in silicon, TRL 0-1, no prototype.

Anchored evidence

Risk notes - what this claim does not support

Risk notes. The withdrawn expanded specification is not the public record; the withdrawal notice is. Do not reference or paraphrase enabling hardware detail from the withdrawn document under any circumstance. Hardware ceiling absolute.

Verify this claim. The machine-readable priority register is at /research/priority.json (this claim is PC-037 in claimsLedger[]). The full public ledger view is at /priority-claims. Where evidence points at a redacted evidence/... path, the public verification method is documented at /research/evidence-spine.html. Every result is independently checkable via the OSF programme at osf.io/6c5xb (DOI 10.17605/OSF.IO/6C5XB).

← Back to the priority claims register · public ledger view · machine-readable priority record · home.